Sunday 26 January 2014

Final Project Year 3: Finalised Dome Building design.


These are the finalised designs for the Dome building. All of the elevations are similar for this building so only two have been drawn, one floor plan is shown and a section is included with the elevations. Three details have been included.


This has got my blog back up to date and future posts will be further revisions of my design.

No comments:

Post a Comment